LiftAuth US › NYC guides › Cat 5 full-load test

The NYC Cat 5 elevator test, due every five years

Cat 5 is the full-load test each New York City elevator needs every five years. A missed Cat 5 report costs more than a missed Cat 1.

Last checked Sep 30, 2026 against 1 RCNY §103-02, DOB’s Elevator Compliance page and DOB notices. General information, not legal advice.

The short answer

Cat 5 tests the elevator at rated load and speed every five years, counted from the month of its last Cat 5 or, for a new elevator, the month its Certificate of Compliance was issued. The performing agency notifies the NYC Department of Buildings (DOB) at least 5 calendar days before the test, and a witnessing agency watches it where required. The report is filed within 21 days in DOB NOW: Safety, DOB’s online filing system. A report never filed costs the owner $5,000 per elevator in commercial, mixed-use and 3+ unit residential buildings.

The rule is 1 RCNY §103-02, DOB’s elevator inspection rule.

What the Cat 5 test is

DOB describes Cat 5 as a test “with rated load and speed every 5 years.” The annual Cat 1 test runs the car empty; the Cat 5 runs it at the load and speed it is rated for.

Table N1, in Appendix K of the NYC Building Code, sets which devices need a Cat 5. Check each device type you maintain with the performing agency.

When it’s due

The rule sets the Cat 5 cycle as “within five (5) years from the month” of:

  • the most recent Cat 5 test on an existing elevator, or
  • the issue of the Certificate of Compliance for a new elevator.

The DOB NOW FAQ reads the deadline as the last day of the month in which the five-year anniversary falls.

Example: last Cat 5 in Mar 2022Date
Notify DOB (ELV36 form)At least 5 calendar days before the test
Test must be doneBy Mar 31, 2027
Report due21 days after the test
Last day DOB NOW accepts the reportApr 21, 2027

Elevators in one building can have Cat 5s due in different months and years. Plan them alongside each elevator’s Cat 1.

Plan to the rule’s dates

Count the five years from the month of the last Cat 5, as the rule does; DOB’s older owner page words it as “from date of installation”. File by the 21st of the month after the anniversary. DOB’s Elevator Compliance page says later filings “will not be accepted”, although the DOB NOW FAQ mentions filing “up to one year late”.

Cat 3: the water-hydraulic test

Cat 3 is a test every three years on water-hydraulic elevators only: hydraulic elevators that use water as their fluid. Its three years count the same way as Cat 5’s. It has the same rules as Cat 5 for:

  • the 5-day notice to DOB;
  • the 21-day filing window;
  • the penalty amounts.

Before the test

  • Notify DOB 5 calendar days ahead. The performing agency files the ELV36 test notification form in DOB NOW: Safety before every Cat 3 and Cat 5 test.
  • Book a witnessing agency where a witness is required. Its director signs the report.
  • Agree access with the building. The elevator is out of service during the test. Agree the date with the managing agent when you book the witness.

After the test

The ELV3 test report is filed in DOB NOW: Safety within 21 days of the test.

An unsatisfactory Cat 3 or Cat 5 result can’t be filed. The ELV3 instructions say “Unsatisfactory results are not accepted for Category 3 or Category 5 tests.” Leave time to repair and retest before the anniversary month ends.

A report filed after the last day DOB accepts it is expired, and needs a new test; see late and expired filings. Late and never-filed penalties are in NYC elevator fines.

Sources

  1. 1 RCNY §103-02, Elevator inspections and tests (DOB, PDF) — Cat 3 and Cat 5 cycles, 21-day filing, notice, penalties.
  2. DOB, Elevator Compliance — rated load and speed, last filing day on the 21st of the following month.
  3. DOB Service Update, New Requirements for Category Testing of Elevators (Dec 30, 2021, PDF) — 5-day notice, Cat 3 for water-hydraulic elevators, director signature.
  4. DOB NOW: Safety Elevator FAQs — anniversary-month reading, the “one year late” wording.
  5. ELV3 instructions (2015, PDF) — unsatisfactory Cat 3/5 results not accepted; Cat 3 for water-hydraulic elevators only.
  6. DOB, Elevators (owner page) — Cat 3 for water-hydraulic elevators; older “date of installation” wording.

Common questions

What is a Cat 5 elevator test?

A test of the elevator at its rated load and speed, required in New York City every five years. It is witnessed where required and filed in DOB NOW: Safety within 21 days.

How often is a Cat 5 test required in NYC?

Within five years from the month of the elevator’s last Cat 5, or from the month a new elevator’s Certificate of Compliance was issued.

What is the penalty for missing a Cat 5 test?

$5,000 per elevator for a report never filed in commercial, mixed-use and 3+ unit residential buildings, and $1,000 in 1–2 family homes. Late filing costs $250 a month, up to $3,000 ($50 a month, up to $600, in 1–2 family homes).

What’s the difference between Cat 3 and Cat 5?

Cat 3 is a three-yearly test for water-hydraulic elevators only. Cat 5 is the five-yearly test at rated load and speed. Both need 5 days’ notice to DOB and a 21-day filing, and carry the same penalties.

Track this in LiftAuth

For a witnessed test, add the witnessing agency as an Auditor: it books a time from your Team’s calendar through one link, and the Building Manager agrees to it. Defects are logged as Issues against the elevator, with photos, until they are resolved. LiftAuth does not file the ELV36 or the ELV3 in DOB NOW.

Try LiftAuth on your own elevators.

To talk to us, email hello@liftauth.com or fill in the form here.

We use these details to reply to you and to see which pages you visited first. See our privacy policy.